Home
Build Index
Next Page
Previous Page
Assembling the chassis
The inside of the firebox.
The Chassis so far with Cylinders assembled.
Starting to assemble the valve gear.
A trial fit of the boiler to the chassis.
Next
Previous
Index
Home